- Bathtubs & Whirlpools[10]
- Shower Rooms[8]
- Sauna Rooms[10]
- Spa Tubs[1]
- Garden Sets[10]
- Patio Umbrellas & Bases[4]
- Bath Mats[8]
- Aquariums & Accessories[6]
- Electric Water Heaters[2]
- Water Filter[10]
- Pumps[5]
- Pool & Accessories[10]
- Contact Person : Ms. Lee Candice
- Company Name : Guangzhou Anyi Swimming Pool Sauna Leisure Equipment Firm
- Tel : 86-20-28944131
- Fax : 86-20-81054959
- Address : Guangdong,Guangzhou,Store 57-3(for self-edited number) First Floor,NO.33,Nan'an Road,Liwan District
- Country/Region : China
- Zip : 510000
Related Product Searches:White acrylic nice steam shower room,computerized shower room,High Quality,steam shower room, computerized shower room,AT-GT8202F
Luxurious computerized steam shower Room :
Basic data:
Luxurious computerized steam shower Room | |
Shape | Sector |
Opening | Sliding |
Glass thickness | 6mm |
Bottom material | Acrylic |
Controller | Computer Control Panel |
Brand | Austar |
Place of origin | Guangzhou,China |
Room size | 1380*1380*2150mm |
Weight | 230 kg |
Media | TV and DVD player |
Massage | Back massage |
Color | White-off bottom and glass shower room |
Volume | 2.81 cbm |
Package size | 1340*1340*700mm,1620*1650*570mm |
CONTROLLER :
1.Remote control (Infrared ray)
2.Induction type technology (Capacitance)
3.Steam(3-5 KW Timing constant temperature 3-5KW)
4.FM radio(Self-select and self-locking)
5.Lighting
6.B-Lig
7.Ventilating fan
8.Ozone
9.Telephone (Receive/dial)
10.AUX(External equipment input)
11.Emergency artificial resort
12.Keyboard locking
13.Failure Intelligent Testing Indication
CLEANING:
∞∞Generally,use the cloth which soak by litmusless detergent(light scour,soap and water)can clean the shower cubicle.
∞∞Do not use strong deliquescent substance like strong scour,alcohol,gas,acetone and so on. ∞∞If the smutch is bad and heavy,you can use low consisitency acetum,but must clean by water finally.
INSTALLATION:
(Tool need:Level gauge,pencil,cross-head screw driver,Iron hammer,percussive drill,tape measure,movable wrench,silicon glue water gun,dimeter 6 aiguille)
STEP1:
∞Put the shower tray on the right place and adjust feet to the level position by level gauge; ∞Please confirm the wasted drainage position
STEP2:
∞Put the movable glass door on the bottom crock,line up the drilling sites of lower track and bottom crock,and fix the movable glass door tightly with 3 ST 4*12 self-tapping screw.
∞Adjust the pulley with screw driver and spanner as shown in the drawing to make the push-and-pull of movable glass door smooth and ensure there is no gas between the two doors when being shut.
STEP3:
∞Put two pieces of side glass on bottom crock,line up the drilling sites of side glass and movable glass door ,and those of side glass and bottom crock
∞Fasten the side glass and movable glass door tightly with 10 ST 4*12 self-tapping screws.
∞Fasten the side glass to bottom crock tightly with 2 ST 4*12 self-tapping screws.
STEP4:
∞Put the functional aluminum alloy on underchassis,line up the drilling sites of side glass and lightening post functional board (aluminum alloy),and fasten the functional aluminum alloy to side glass tightly with 10ST 4*12 self-tapping screws.
STEP5:
∞Place the top cover on booth body and line up screw drilling sites,then connect the top cover with backboard with the use of M6*30 machine screws and M6 nuts(ten for each),and fasten it to the upper track of movable glass door with 5ST 4*16 self-tapping screws
∞Connect the shower head and sole massage to backboard with hose and place them on the designated position of booth body.
∞Connection of water circuit:connect spray nozzle,massage,shower head and top spray nozzle with water faucet separatcly according to the drawing ∞Connection of electric circuit:connect the electric wires according to there colors
STEP6:
∞Link the waterway and circuitry
STEP7:
∞Put the top roof on the shower cover
∞Put thesilicon glue water into the connecting parts of the acrylic back panel ,aluminum down and shower tray ∞Connect the electric power supply well
>Our Deliver Time
3-5 working days if we have store; 7-10 working days if your order is large; All goes according to the practice situation;
>Payment Terms
30% in advance, 70% balance should be paid before delivery Discount: Offer based on order quantities.
More similar steam shower room:
AT-G0211:
AT-G8201:
AT-GT9051TV-DVD:
AT-G9050-1 TV-DVD:
AT-GT8838AF:
Payment:
Payment Terms | |
Payment | 30% in advance,70% balance should be paid before delivery |
Lead time | 7-15 working days |
Port of loading | Guangzhou ,China (Mainland) |
Discount | offer based on order quantities. |
If you want to purchase your appointed steam shower room, kindly inform us,we can make for you according to your request.
White acrylic nice steam shower room,computerized shower room